Bitmain Antminer MB-H200-S-3U Hydro Cooling Support (14 Asic Miners)

SKU: MB-H200-S Categories: ,
Welcome Coupon 5% OFF
WEL-RW-5
Express Shipping
PSU Included
Quick Assist
Bundle Discounts

$2,867.16

Accepted Cryptocurrency Payments

Bitcoin (BTC)
Ethereum (ETH)
Tether (USDT)
Dogecoin (DOGE)
Solana (SOL)
Litecoin (LTC)

The MB-H200-S-3U Hydro Cooling Suite supports up to 14 Antminer hydro miners with deionized water circulation, combining compact design and powerful cooling for efficient home mining.

Description

The MB-H200-S-3U Hydro Cooling Suite supports up to 14 Antminer hydro miners with deionized water circulation, combining compact design and powerful cooling for efficient home mining.

Specifications

Model FHWDC200
Miners capacity 14 * Antminer 3U S21EXPH
Maximum load,kW 200kW
PDU 20 Port SA2-30 Smart PDU
Network 1000M Network Switch
Operation Temperature -25℃~45℃
Operating Humidity 5%~95%RH
Water Manifold Stainless Steel
Hose PE/PTFE Hose + Quick Connects
Cooling Capacity 200kW
Power 3.5kW
Input Voltage 3-Phase 380V-480V, 50/60Hz
Inlet/Outlet 10°C (Normal)14°C (High Performance)
Cooling Pure Water / Soft water + Antifreeze + Corrosion Inhibitor
Communication Method Modbus-RTU,TCP/IP
PLC System Constant flow control with pressure regulation
Fluid Flow Rate 20m³/h
Operating Temperature -25°C ~ 45°C
Design Pressure 0.3MPa
Module Dry Cooler V Type
Wight(Empty Load) 800kg
Fan(s) 2
Connection DN50
Fluid Coolant
Fluid flowrate 20m³/h
Inlet/Outlet Temperature 55℃/40℃
Ambient temperature 35℃
Fin/Tube Materials 304 Stainless steel,Al-mg/AI
Operating/Maximum Pressure 0.3MPA/1.6MPA
Processing & Shipping Time
  • Order Processing: All orders are processed and dispatched within 48 hours after verified full payment, unless otherwise stated. Bulk orders may require an additional 1–2 business days for handling.
  • Shipping Carriers: We ship exclusively via reputable international carriers such as DHL Express, UPS, FedEx, ARAMEX, and TNT. Bank transfer clearing times vary by bank and location. Cryptocurrency payments are typically confirmed within 1 business day.
  • Estimated Delivery: Standard international shipping usually takes 4–7 business days to arrive after dispatch. Actual delivery may be affected by customs clearance and local carrier conditions, with total delivery time ranging from 8–10 business days.
Payment Policies
  • Accepted Payments: We accept payments by Stripe (credit/debit cards) and cryptocurrencies supported at checkout. All prices are displayed in U.S. Dollars (USD).
  • Cryptocurrency Payments: Due to market volatility, cryptocurrency payments are calculated at the current exchange rate displayed at checkout. The final payable amount is confirmed at the time of payment.

Taxes and Custom Duties
  • Customs & Delivery: Shipments are managed through DHL, UPS, FedEx, ARAMEX, and TNT for most international destinations.
  • DDP Option: We offer Delivery Duty Paid (DDP) service in select countries, which covers customs, duties, and taxes in the purchase price. Advance arrangement is required - please contact info@runwells.com for details.
  • Returns to United State: If a product must be returned to United State , the customer is responsible for all related shipping fees as outlined in our Returns & Refund Policy.
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Bitmain Antminer MB-H200-S-3U Hydro Cooling Support (14 Asic Miners)”

Your email address will not be published. Required fields are marked *